A fresh graduate in Civil Engineering from Hasanuddin University holds a strong interest in the Construction industry, particularly in roles such as HSE Engineer, Quantity Surveyor, and Scheduling Engineer.
Maret 2024
Universitas Hasanuddin
S1•Teknik Sipil•
IPK 3.73
Mei 2020
SMAN 2 MAKASSAR
SMA/SMK•Ilmu Pengetahuan Alam•
Nilai rata-rata: 90
Juli 2024 - Desember 2024
Internship_Department Perencanaan Fasilitas Pelabuhan_Kantor Pusat_Batch 3 Tahun 2024
Verified intern of
PT Pelabuhan Indonesia (Persero)•Magang
September 2023 - Desember 2023
Student Center Building Construction Project (Class Project)
Hasanuddin University•Project Base
Student Center Building Construction Project, as part of a major project assignment in the Integrated Civil Engineering Design course.
1. Conducted preliminary design calculations, including BoQ (AHSP and RAB), and prepared schedules and S-curves
2. Prepared written reports covering the following: Philosophy and Main Concept; Specifications; Structural Calculations; Detailed drawings; BoQ; Scheduling and S-Curve
3. Successfully completed tasks on time and achieved a grade of A with an index of 4.00
Januari 2023 - Maret 2023
Junior Site Superintendent Intern
PT Makassar Metro Network•Magang
1. Successfully monitored the construction project of Makassar New Port (MNP) Access Road (Stages I and II) to ensure timely completion and adherence to agreed-upon quality standards
2. Reconstructed the As-Built Project (AHSP) for the completed pile cap work and compared it with the official AHSP provided by the owner. The manual AHSP calculations, match the official AHSP
3. Calculated and compared the actual progress of pile cap, pier column, and pier head construction on-site with the planned S-curve to ensure accurate tracking
4. Provided comprehensive support to ensure that all site workers strictly followed health and safety protocols
5. Assisted in monitoring shop drawings from the owner to ensure accuracy and compliance
6. Assisted in monitoring the arrival of truck mixers during the casting process to ensure timely and efficient material delivery
7. Supervised the concrete slump test before the casting process to ensure compliance with quality standards
Oktober 2022 - November 2022
Pembangunan Rumah Dinas Puskesmas di Deer Project (Class Project)
Hasanuddin University•Project Base
Pembangunan Rumah Dinas Puskesmas di Deer, as part of a major project assignment in the Project Planning and Control course.
1. Planned and scheduled a minimalist 6x12 house project using Microsoft Project, and prepared Bills of Quantity (BOQ) for the stone foundation work on the fence
2. Updated the project execution schedule (S-curve) for Pembangunan Rumah Dinas Puskesmas di Deer based on actual progress, and identified significant factors contributing to project delays from the new schedule
3. Successfully completed tasks on time and achieved a grade of A with an index of 4.00
Selama mengikuti pelatihan dan pembinaan AK3U ini saya banyak mendapatkan pembelajaran dan pengalaman yang sangat luar biasa, dari regulasi-regulasi yang digunakan sampai pada tahap pelaksanaannya ketika disuatu perusahaan.
Training Quantity Surveyor: Cost Estimation Technique using Microsoft Excel (Kursus Perhitungan RAB Pada proyek Gedung dengan bantuan Sketchup + Microsoft Excel)
Kursus Sipil•4d50b86e-64ba-40ef-9c30-89d3b6f7cbea
1. The Definition of Cost Estimation
2. Quantity Take Off
3. Calculating Construction Elements
4. Knowing The Units in RAB
5. RAB Calculations
6. The Understanding of AHSP
7. Perform Unite Price Analysis
8. Make a Job List
9. Quantity Take Off
10. Make Unit Price From AHSP
11. RAB Calculation
Media
Lihat Media
Mei 2024
Intensive Course (Intermediette) Metode Pengendalian Jadwal Proyek Infrastruktur (Jalan & Jembatan) dengan Ms Project
Kursus Sipil•b6a2fe1f-9a3d-4a11-a127-2b254aba4d03
1. Dasar-dasar Penjadwalan
2. Pengenalan fitur Microsoft Project
3. Strategi Menyusun WBS dan Activity
4. Menentukan durasi pekerjaan dan keterkaitan pekerjaan
5. Setting tampilan jadwal dalam Ms Project
6. Menentukan milestone
7. Develop schedule
8. Menetapkan target schedule/baseline
9. Mengupdate (tracking) schedule
10. Evaluasi lintasan kristis
11. Monitoring schedule