Curriculum Vitae
                            Zakiyya Al Fakhira Fita Ananda
Media Social
Eager to contribute to the energy industry’s growth by applying both technical and non-technical skills
April 2025
Institut Teknologi Sepuluh Nopember
S1 • offshore Engineering • IPK 3.61
April 2025 - Juni 2025
Junior Engineer
PT. ZEE Indonesia • Contract Base
                                                    • Responsible for the 3D modelling and structural analysis of the modified jacket platform for deck extension. 
• Perform input and verification of additional loads from the deck extension (weight of new equipment). 
• Running structural analysis simulation to evaluate the jacket platform behavior after the addition of deck extension. 
• Prepared Material Take-Off (MTO) for deck extension on offshore jacket platform project.
                                                
Juli 2024 - Agustus 2024
Practical Work Program
PT Pertamina Hulu Energi ONWJ • Magang
                                                    • Gained experience and knowledge in Subsea Hose Replacement Project on Single Point Mooring (SPM) #3. Completed a research project titled “Risk Assessment Analysis of Subsea Hose Replacement Project on Single Point Mooring (SPM) #3”.  
• Providing risk controls based on the hazards that can cause failure when subsea hose replacement project is carried out for the company
                                                
Oktober 2023 - Maret 2025
Junior Engineer
PT. Citra Mas • Magang
                                                    • Contributing on Zulu Terminal Marine Conceptual Study Hazard Identification. 
• Contributing on FSO Arco Ardjuna Towing, Tank Cleaning, and Lay-Up Preparation Project. 
• Contributing on Ship-To -Ship (STS) Comprehensive Mooring & Swapping Operation at Single Point Mooring (SPM) #4 Project. 
• Perform mooring system analysis to connect the FSO to the Single Point Mooring.
• Conduct static and dynamic analysis using software (OrcaFlex) to predict the behavior of the mooring system under environmental conditions (currents, waves, wind).
• Provide technical recommendations for the selection of mooring components (chain, hawser, anchor) and estimation of fatigue life of hose and chain systems.
• Conduct analysis of the maximum mooring line tension and clearance on subsea hose and floating hose.